Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13679109

- Product Categories
- Friendly Links
Information Name: | Chongqing bridge plate bottom STRENGTHENED |
Published: | 2015-03-29 |
Validity: | 30000 |
Specifications: | 200 / 300g |
Quantity: | 10000.00 |
Price Description: | |
Detailed Product Description: | Carbon fiber binder (A component: component B = 3: 1) carbon fiber reinforced plastic Features: 1, with excellent corrosion resistance and heat resistance. 2, infiltration, can be well into the concrete surface. 3, thixotropic strong, flowing less construction. 4, the plastic does not contain volatile solvents, low shrinkage after cure of 1.3% -2%. 5, the lowest temperature of the rubber is 5 ℃, humidity of 85% is not suitable for the construction, while avoiding the substrate surface temperature and ambient temperature difference is too large, in order to prevent dew after pasting the impact strength. Applications: 1, applied to carbon fiber sheets and concrete, steel components, structural bonding masonry construction components. 2, used in reinforced concrete tension members of carbon fiber sheet bonded construction. Performance indicators: packaging, transportation, storage: 1, the product drums, standard packaging specifications for A, B groups were 20 kg / group (A, B collectively referred to as a group). 2, this product does not belong to flammable, explosive materials, available air, rail, sea and road transport. 3, the product-light transport, handling should be in, rain, sun-proof, not upside down. 4, the storage time: The glue storage for one year at room temperature, the performance did not change significantly. CFRP reinforcement Construction Description: Construction process: engineering design → clean polished surface is coated adhesive structure underlying surface → → primer curing refers to dry flat repair → → not to refer to a dry patch glue curing rubber coating infiltration → → carbon fiber sheet refers to dry after construction → → curing → multi-paste inspection and surface decoration. Construction Points: 1, wipe clean the concrete surface. 2. To fix the flat surface to be bonded, to make water leakage sealing, guide treatment. 3, the configuration and coated with plastic bottom, to determine the thickness of the coating according to the specific circumstances of temperature and construction adhesive structure, especially in winter the temperature is below 5 ℃, not construction. 4, the bonding of carbon fiber sheets, the first cut is good according to the technical requirements of the desired size, usually two meters as appropriate. 5, configure glue, generally within the time you can use (about 30 minutes) to limit the amount of the required construction. 6, A, B component glue in accordance with Part A: Group B = 3: 1 ratio is poured into a clean container and mix well. With a smooth surface CFRP roller in the same direction repeatedly rolling to glue oozing fiber cloth surface to remove air bubbles, making CFRP full infiltration glue, carbon fiber sheets overlap area to set aside more than 10CM. 7, multi-paste should be the upper surface of the finger touch dry carbon fiber cloth, and then the next layer of CFRP paste. 8, when it is cured to be anti-rain, anti-wind, and to prevent a hard object bumps bonding surface. 9, the curing time of not less than 3-7 days, according to the requirements for surface coating after curing. 10, AB mixed at 25 ° C for 30-40 minutes operating time. Such as when the temperature is below 25 ° C, the operating time will be extended accordingly. 11, B component in the long storage process prone to discoloration is normal and does not affect the amount of the product performance and use. |
Admin>>>
You are the 8499 visitor
Copyright © GuangDong ICP No. 10089450, Building Technology Co., Ltd. Shanghai Ding-yu All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 8499 visitor
Copyright © GuangDong ICP No. 10089450, Building Technology Co., Ltd. Shanghai Ding-yu All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility